Part 3 Installation
Commissioning
The following commissioning checks must be
carried out before the appliance is handed over for
use, to ensure that the unit operates correctly and
the operator(s) understand the correct operating
procedure.
1. Before leaving the new installation;
a. Check the following functions in accordance
with the operating instructions specified in
the 'Operation' section of this manual.
x Lighting the Griddle.
x Lighting the Open Burners.
x Lighting the Open Burners. (F - Flame
Failure Option).
x Check the Low Fire Burner Operation.
b. Ensure that each operator has been
instructed in the areas of correct lighting,
operation, and shutdown procedure for the
appliance.
2. This manual must be kept by the owner for future
reference and a record of the Date of Purchase,
Date of Installation and Serial Number of
Appliance recorded and kept with this manual.
(These details can be found on the Rating Plate
attached to the underside of the right hand
side, front Cooktop lower trim.
NOTE:
If for some reason it is not possible to get the
appliance to operate correctly, shut off the gas
supply and contact the supplier of this appliance.